The significance of monitoring end distribution over three-phase conductors in distributed fault diagnosis of transmission lines

Author: Click:175 Time:2025-01-16

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission l

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission line distributed fault diagnosis system monitoring terminal distribution characteristics, and each phase of the conductor each installation of a monitoring terminal, this layout contains a number of important significance for ensuring the safe and stable operation of power lines, the key role in ensuring the safety and stability of operation. This layout contains many important meanings and plays a key role in ensuring the safe and stable operation of transmission lines.

1、Three-phase independent monitoring ;.

The A, B and C phase conductors are mutually independent electrical circuits in the transmission process, and the monitoring terminals installed on each phase of the conductor are capable of independently collecting and analyzing the operating parameters of the line in this phase. When a fault occurs, the fault characteristics of different phases may differ depending on the type of fault (e.g., lightning strike/non-lightning strike, high-resistance/metal ground fault, phase-to-phase short-circuit fault, etc.). By using the monitoring end of each of the three phase conductors, it is possible to ground determine in which phase the fault occurs, thus enabling more fault localization. For example, in a single-phase grounding fault, only the monitoring terminal of the faulty phase will detect typical fault characteristics such as a sudden change in the zero sequence current, and O&M personnel can quickly locate the faulty phase based on this information.



2、Space positioning advantages

Multiple observation points - By installing monitoring ends on all three-phase conductors, fault information can be obtained from different spatial locations, and for some faults that may be caused by differences in spatial location (such as inter-phase short-circuits caused by foreign objects, which may be contacted at different locations on different phase conductors), the data of the three-phase monitoring ends can be synthesized to more accurately Determine the spatial location of the fault point, but also the technical parameters of the transmission line distributed fault diagnostic system of the interval localization reliability of more than 99% of the underlying source.

3. Capturing the difference between different phase faults

Different types of faults in the three-phase conductor will show different electrical characteristics, through the comprehensive analysis of the three-phase monitoring end data, can identify a variety of complex fault types, is an important source of data for fault judgment.

4. Redundant monitoring safeguards

The installation of separate monitoring terminals on each of the three phases of the conductor is equivalent to providing redundant monitoring means. Even if a phase of the monitoring end of the communication failure, sensor damage and other failures, the other two phases of the monitoring end can still work normally, continue to provide part of the data for fault diagnosis, reduce the risk of failure due to a single monitoring end of the failure of the entire fault monitoring system failure.  

5. Data cross-validation ;

Under normal operating conditions, the electrical parameters such as current, voltage and phase of the three phases will satisfy a certain balance relationship. By comparing and analyzing the three-phase data, the accuracy of the data can be verified. When the data is abnormal, through the cross-validation of the three-phase data, it can distinguish whether the data change is caused by the real fault or the error or interference of the monitoring terminal itself, which becomes an important basis for the diagnosis process.



Related recommendations

The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

中文字幕一区二区八区六区| 男人天堂一区二区av| 性感少妇人妻中文字幕| 日韩制服国产精品一区| 两性色午夜视频免费网站| 麻豆果冻传媒精品一区| 日韩人妻一级免费视频| 欧美三级久久久久久精品| 蜜桃精品在线免费观看| 国产精品很黄很色很爽的网站| 国产女同av一区二区三区| 国产亚洲一区二区自拍视频| 国产精品网友自拍视频| 一区二区欧美日韩91| 亚洲天堂精品日韩电影| 精品人妻一区2区三区| 国产精品国产三级国产av丨| 五月激情婷婷开心五月| 国产一区丝袜高跟在线| 懂色一区二区二区av免费观看| 日韩新片一区二区三区| av欧美一区二区三区| 欧洲日韩国产一区二区 | 免费草逼视频在线观看| 国产一区二区三区不卡视频| 亚洲中文有码一区二区| 中文字幕日韩精品成人免费区二区| 日本男女一区二区三区| 自拍偷拍免费福利视频| 亚洲中文字幕少妇熟女美妇| 国产白丝精品91爽爽久| 国产精品美女久久久网站三级| 国产一区二区久久不卡| 日本一区二区三区精品视频| 国产一区二区三区黄网| 欧美另类精品一区二区三区| 国产精品国产专区国产三级| 97日韩在线免费视频网站| 亚洲夫妻性生活免费视频| 色呦呦中文字幕在线播放| 男女激情四射午夜福利视频网站|